I suspect today is one for celebration, as one part of the wall is complete..

Ta-dah


Putting it all together...
Completed bed box, I now have somewhere to sleep.  Essential item no.1 finished (item number 2 is water and number 3 is cooking)....

Bed box with additional strengthening bits.

Lower part of the wall, with cut-out and platform for water heater, and mains hookup (small hole on the left)



 
Water Heater in-situ, notice hot and cold water pipes at the ready.

2x110aH leisure battteries.  For our European viewers, this is what 2 foot looks like.

Again, with lids on.  2 feet again visible.
 
Silver tape over the expanding foam.  The black line is the gas pipe for the water heater before its bent into position....

I now have a plan for completing the roof, have some cables for the power unit on their way, and have some bolts ready to finish the LPG tank, so expect some progress over the next few days.  Oh and I am biking all weekend :)