Before it did, I managed to fit a window for the bathroom:
Bathroom Window – notice its right above the wheel arch, which will no doubt cause a bit of fun when fitting the bathroom. This window is hinged at the top (the others are sliders) – it is the narrowest Seitz S4 you can get.
Bit of a window reveal thing.
I also tested the fit of the roof ply – I have some self drilling screws (thanks Shaun) that are just the job to get through the ply and into the metal ribs.
Testing the roof fitting.
Then the weather came…
I still managed to get a lot of the insulation in place:
Celotex invasion….
I also received the replacement gas tank, which does look a lot more manageable, and here is the custom water tank, thanks to Neil at EMPF (http://www.plasticwatertanks.co.uk)
So all I need now is some dry weather to get some of this done, however current forecast is not good, and time is marching on!
1 comment:
Nice progress so far, but working with power tools doesn't seem a good idea but a bold one :) - press on cowboy.
Post a Comment